Ansheng's Major Production Facilities In Yongkang, China

These facilities are expansive and play a crucial role in Ansheng's overall operations.

Scale & Capacity:

  • Total area: 420,000+ sqm (1.3 million+ sqft upon 2025 expansion).
  • Monthly output: 9 million+ units, encompassing vacuum containers, specialty products.

Key Business Units (BUs):

  • Vacuum Container BU: Hydro - forming technology for 2.4 million inner / outer cups monthly.
  • Specialty Container BU: Deep - drawing + hydro - forming hybrid processes for 1.8 million premium products monthly.
  • Commercial Container BU: Manufactures large SUS containers, household products, outdoor SUS ware, and irregular SUS items for 1.4m PCs.
  • Ansheng Plastics: Holds the largest plastic parts capacity in the drinkware industry with over 230 injection machines, producing 4 million plastic parts monthly.

Research and Development:

10% of sales revenue was reinvested into R&D and Automation
  • ODM DEVELOPMENT
  • CMF TREATMENT
  • INFORMATION SYSTEM
  • AUTOMATION
  • TEST CENTER

Factory Figures

1268

Floor Area(1K sq ft)

3600

Employees

60+ MILLION

Yearly Capacity

Production Line

10+ LINES
1

10+ LINES

DEEP - DRAWING

22+ LINES
2

22+ LINES

METALWORKING

25+ LINES
3

25+ LINES

WELDING

30+ SETS
4

30+ SETS

VACUUMIZATION

50+ LINES
5

50+ LINES

ELECTROLYSIS

24+ LINES
6

24+ LINES

POLISHING

50+ LINES
7

50+ LINES

CMF

230+ LINES
8

230+ LINES

PLASTIC INJECTION MOLDING MACHINE

30+ LINES
9

30+ LINES

ASSEMBLY / PACKING

Ansheng's First Overseas Manufacturing Base In Kuala Lumpur, Malaysia

It is quite expansive and play a crucial role in Ansheng's overall operations.

Strategic Advantages:

  • Southeast Asia hub serving global markets. Proximity to Kuala Lumpur International Airport (14 miles) and Port Klang (30 miles), reducing logistics time by 30%.

3-Phase Capacity Expansion:

  • Phase 1 (Q3 2024): 1.25 million units/year.
  • Phase 2 (Q4 2025): 35 million units per year.
  • Phase 3 (2026): Plastic Injection factory - localization.

Localization & Quality:

  • 90% raw materials locally sourced within 1 year (excluding molds).
  • ISO 9001/14001/45001 certifications, supported by in - house lab testing (material strength, leak - proof performance).

Factory Figures

1 million

Floor Area (square feet)

800

Employees

2 MILLION

Monthly Capacity

Ansheng Tech Five Year Strategical Plan

2025

UPGRADING

  • · Hardware, Software & Talents
  • · both China and Overseas
  • · Digitalization
2026

RAMP UP

  • · Capacity increasing
  • · Production Efficiency
  • · Plastic tooling in-house
  • · SEA sales center
2027

SUSTAINABILITY

  • · Absolute emission reduction 7%
  • · Carbon Foot-Prints
  • · Sustainable material application
  • · Overseas CMF treatment center
2028

OVERSEAS EXPANSION III

  • · Ansheng Malaysia Production Capacity Line 8th-9th
  • · R&D + Tooling Center
  • · Possible exploring overseas facility outside of Asia
2029

DIFFERENTIATION

  • · Products
  • · Digitalization+ Services
  • · Manufacturing Capability